What is in, and what is outside it
Every engagement is written down before it starts: what is being built, in numbered lines, and a matching list of what is NOT included.
The exclusion list is not fine print and it is not defensive. Most arguments between a contractor and a client are about something one side assumed was in and the other assumed was out, and the only reliable cure is to write both lists at the same time.